Jump to content
reader

Vietnam's second metro line opens

Recommended Posts

From VN Express

image.thumb.jpeg.2b132087e22361ea932b2b05e472ab1f.jpeg

The Nhon-Hanoi Station metro line in Hanoi is operational from 8 a.m. Thursday, becoming the second running metro line in Vietnam after 15 years in the making.

There were not many passengers present at the S8 Station on the opening day. Most of them were elderly people and students.

Hoang Minh Tan, 75, from Ba Dinh District, who took a ride on the opening day, said: "The stations and the trains are nice. They feel better than the Cat Linh-Ha Dong metro line."

Cat Linh-Ha Dong in Hanoi was launched in November 2021 as the first metro line in Vietnam.

The second line covers a total distance of 12.5 km, featuring eight elevated stations and four underground ones. Only the elevated section of 8.5 km from Nhon to Cau Giay was launched on Thursday, while the underground portion of 4 km from Cau Giay to Hanoi Station is scheduled to complete in 2027.

During the initial three months, the metro line will operate daily from 5:30 a.m. to 10 p.m., with trains running every 10 minutes. The schedule may be adjusted based on passenger demand.

The metro rides are free during the first 15 days of operation. Then tickets are set at VND8,000 (US$0.32) for a single ride, VND12,000 for a full-line ride, VND24,000 for a day pass, and VND200,000 for a monthly pass. Students receive a discounted monthly pass at VND100,000. Children under six, seniors over 60, people with disabilities, and certain prioritized groups can ride the trains for free.

Tickets are circular, resembling coins. Passengers scan these at the gates to enter and place them in scanners to exit the train. Tickets are valid for 20 minutes after purchase, and passengers must "update" them if they do not board the train within this timeframe.

The metro line consists of 10 trains, each capable of reaching a maximum speed of 80 kph. Every train has four cars, with each car accommodating up to 236 passengers. A total of 353 employees manage the line's operations.

image.jpeg.13c64cb7d523a38adda5eedb8b00c787.jpeg

 

 

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.



×
×
  • Create New...