Jump to content
reader

Bangkok to launch electric buses and route expansion

Recommended Posts

Posted

From Pattaya Mail

image.jpeg.802e8351a041cc73b7ba869a7dfebf58.jpeg

Bangkok’s Bus Rapid Transit (BRT) system is set for significant enhancements this year, with the introduction of electric buses in July and a proposed route expansion. The Bangkok Metropolitan Administration’s Traffic and Transport Department has finalized a deal with the Bangkok Mass Transit System (BTSC) for a fleet of 23 electric buses from China, part of a five-year plan valued at 465 million baht.

These new buses are designed with doors on both sides to accommodate stops along Rama IV Road and the original BRT route, along with low-floor features for improved accessibility.

Plans to extend the BRT route include adding two more stops to the existing 15.7-kilometer line that links Sathon and Ratchapruek roads. The extension will also stretch an additional 2 km from Sathon road to Rama IV road, facilitating an interchange with the MRT Blue Line at Lumpini Station. Adjustments to the service hours are in response to passenger demand, with operations set from 6 a.m. to 10 p.m. daily. During peak hours, buses are expected to run every seven minutes, a significant improvement from the current 15-minute interval during less busy periods. The fare for the entire route will remain at a maximum of 15 baht.
 

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.



×
×
  • Create New...