reader Posted March 15 Posted March 15 From VN Express The construction of the T3 domestic terminal at HCMC's Tan Son Nhat International Airport is set to finish in April 2025, two months ahead of schedule, in time for the Reunification Day holiday April 30. According to Le Khac Hong, the head of the project management board, in order to shorten the schedule and bring the project to completion by April 30 next year, the investor and contractors are determined to intensify manpower, machinery, equipment, and construction efforts. Covering a total construction area of 112,500 sq.m., the terminal is designed to have an annual capacity of 20 million passengers, with a scale of one basement floor and four above-ground ones. It is expected to help double Tan Son Nhat's operational capacity, thus reducing traffic congestion both inside and outside the currently overloaded airport. TMax, Marc in Calif and fedssocr 3 Quote
fedssocr Posted March 15 Posted March 15 That's good to hear. Transferring between the current domestic and international terminals is a bit of a pain. So hopefully the new terminal makes that a smoother experience. Quote