Jump to content
reader

Excavation of Thailand’s longest railway tunnel has begun

Recommended Posts

From Thai Train Guide

chiangrai_01-800x445.jpg

By Richard Barrow

Excavation of what will be Thailand’s longest tunnel has officially begun in northern Thailand. The 6.2 kilometre long tunnel is part of the Den Chai to Chiang Khong railway that is now being built to connect Thailand with Laos. Of particular interest for tourists is that this new line will also have a railway station on the outskirts of Chiang Rai city. If the double track line is finished on time, it is expected to open for service in 2028. 

The Den Chai – Chiang Rai – Chiang Khong railway line will have a total distance of 323.10 kilometers. It is part of the development plan of the railway system in Thailand that will connect the existing railway network to neighboring countries such as the Lao People’s Democratic Republic (Lao PDR) and the Republic of the Union of Myanmar. It will help promote travel and transportation of goods from Thailand to neighboring countries more easily and at a reduced cost.

Continues with photos

https://www.thaitrainguide.com/2023/03/06/excavation-of-thailands-longest-railway-tunnel-has-begun/

 

 

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.



×
×
  • Create New...